1 |
ab11 |
1.1 |
Minutes of Meeting, 30/10/2000 @ 10:20 |
2 |
|
|
Location: UKC Computer Science Meeting Room |
3 |
|
|
|
4 |
|
|
Present: ab11, ajm4, tdb1 |
5 |
|
|
Absent: pjm2 |
6 |
|
|
|
7 |
|
|
Absentee(s): Unable to attend due to weather conditions. |
8 |
|
|
|
9 |
|
|
The intention of the meeting was to complete the Time Plan |
10 |
|
|
Allocation, which is a required deliverable. Although almost |
11 |
|
|
finished tasks had not been allocated to group members. |
12 |
|
|
|
13 |
|
|
Tim noted that a soft reboot of Compsoc1 may be required to |
14 |
|
|
enable the meeting to proceed as planned. Compsoc1 quietens |
15 |
|
|
down. |
16 |
|
|
|
17 |
|
|
A discussion about the sizes of compiled C++ programs on |
18 |
|
|
solaris concluded that the actual size of the binary |
19 |
|
|
executable is down to the setup of the compiler on the |
20 |
|
|
target machine. It is decided that we should not worry |
21 |
|
|
about this hurdle until further into the projects |
22 |
|
|
development. |
23 |
|
|
|
24 |
|
|
The technologies which the project would ultilise were |
25 |
|
|
discussed and the following points raised. |
26 |
|
|
|
27 |
|
|
- During the first few phases of the development our own |
28 |
|
|
protocol should be used for communication between Hosts |
29 |
|
|
and server, and server and clients. If a defined technology |
30 |
|
|
such as SNMP is decided upon then this can easily be sub- |
31 |
|
|
stituted in due to the modular design of the applications. |
32 |
|
|
|
33 |
|
|
- The protocol should be based on XML or a system not too |
34 |
|
|
dissimilar. The reason for this is it all text based and |
35 |
|
|
thus easier to process. |
36 |
|
|
|
37 |
|
|
- The use of UDP and TCP/IP as communication layers between |
38 |
|
|
hosts and filer/collectors. To be discussed further with |
39 |
|
|
possible input from JC and PSSC. |
40 |
|
|
|
41 |
|
|
The use of heart beats was also discussed. It was decided |
42 |
|
|
that further thought would have to be given to the implication |
43 |
|
|
of these before they would be finalised. |
44 |
|
|
|
45 |
|
|
Meeting concluded @ 12:00pm |
46 |
|
|
|
47 |
|
|
Meeting re-conviened @ 3:00pm |
48 |
|
|
|
49 |
|
|
Discussion on the implemention of the plugin technology |
50 |
|
|
concluded that data should flow through plugins in a |
51 |
|
|
sequental manner and should remain as plain text at all times. |
52 |
|
|
It was also discussed that plugins should have a 'order' coded |
53 |
|
|
into them, to allow the data to flow in a suitable manner for |
54 |
|
|
the plugins. |
55 |
|
|
|
56 |
|
|
Meeting concluded @ 4:30pm |