Minutes of Meeting, 30/10/2000 @ 10:20 |
2 |
|
|
Location: UKC Computer Science Meeting Room |
3 |
|
|
|
4 |
|
|
Present: ab11, ajm4, tdb1 |
5 |
|
|
Absent: pjm2 |
6 |
|
|
|
7 |
ab11 |
1.3 |
Absentee(s): Unable to attend due to lack of commitment. |
8 |
ab11 |
1.1 |
|
9 |
|
|
The intention of the meeting was to complete the Time Plan |
10 |
|
|
Allocation, which is a required deliverable. Although almost |
11 |
|
|
finished tasks had not been allocated to group members. |
12 |
|
|
|
13 |
|
|
Tim noted that a soft reboot of Compsoc1 may be required to |
14 |
|
|
enable the meeting to proceed as planned. Compsoc1 quietens |
15 |
|
|
down. |
16 |
|
|
|
17 |
|
|
A discussion about the sizes of compiled C++ programs on |
18 |
tdb |
1.2 |
Solaris concluded that the actual size of the binary |
19 |
ab11 |
1.1 |
executable is down to the setup of the compiler on the |
20 |
|
|
target machine. It is decided that we should not worry |
21 |
|
|
about this hurdle until further into the projects |
22 |
|
|
development. |
23 |
|
|
|
24 |
tdb |
1.2 |
The technologies which the project would utilise were |
25 |
ab11 |
1.1 |
discussed and the following points raised. |
26 |
|
|
|
27 |
|
|
- During the first few phases of the development our own |
28 |
|
|
protocol should be used for communication between Hosts |
29 |
tdb |
1.2 |
and server, and server and clients. If a defined |
30 |
|
|
technology, such as SNMP, is decided upon then this can |
31 |
|
|
easily be substituted in due to the modular design of the |
32 |
|
|
applications. |
33 |
ab11 |
1.1 |
|
34 |
|
|
- The protocol should be based on XML or a system not too |
35 |
tdb |
1.2 |
dis-similar. The reason for this is it all text based and |
36 |
ab11 |
1.1 |
thus easier to process. |
37 |
|
|
|
38 |
|
|
- The use of UDP and TCP/IP as communication layers between |
39 |
|
|
hosts and filer/collectors. To be discussed further with |
40 |
|
|
possible input from JC and PSSC. |
41 |
|
|
|
42 |
|
|
The use of heart beats was also discussed. It was decided |
43 |
tdb |
1.2 |
that further thought would have to be given to the |
44 |
|
|
implication of these before they would be finalised. |
45 |
ab11 |
1.1 |
|
46 |
|
|
Meeting concluded @ 12:00pm |
47 |
|
|
|
48 |
|
|
Meeting re-conviened @ 3:00pm |
49 |
|
|
|
50 |
|
|
Discussion on the implemention of the plugin technology |
51 |
|
|
concluded that data should flow through plugins in a |
52 |
tdb |
1.2 |
sequential manner and should remain as plain text at all |
53 |
|
|
times. It was also discussed that plugins should have a |
54 |
|
|
'order' coded into them, to allow the data to flow in a |
55 |
|
|
suitable manner for the plugins. |
56 |
ab11 |
1.1 |
|
57 |
|
|
Meeting concluded @ 4:30pm |