ViewVC Help
View File | Revision Log | Show Annotations | Revision Graph | Root Listing
root/i-scream/projects/cms/documentation/minutes/minutes-20001030.txt
Revision: 1.1
Committed: Tue Oct 31 14:50:17 2000 UTC (23 years, 6 months ago) by ab11
Content type: text/plain
Branch: MAIN
Log Message:
Minutes dated 30/10/2000 ab11.

File Contents

# Content
1 Minutes of Meeting, 30/10/2000 @ 10:20
2 Location: UKC Computer Science Meeting Room
3
4 Present: ab11, ajm4, tdb1
5 Absent: pjm2
6
7 Absentee(s): Unable to attend due to weather conditions.
8
9 The intention of the meeting was to complete the Time Plan
10 Allocation, which is a required deliverable. Although almost
11 finished tasks had not been allocated to group members.
12
13 Tim noted that a soft reboot of Compsoc1 may be required to
14 enable the meeting to proceed as planned. Compsoc1 quietens
15 down.
16
17 A discussion about the sizes of compiled C++ programs on
18 solaris concluded that the actual size of the binary
19 executable is down to the setup of the compiler on the
20 target machine. It is decided that we should not worry
21 about this hurdle until further into the projects
22 development.
23
24 The technologies which the project would ultilise were
25 discussed and the following points raised.
26
27 - During the first few phases of the development our own
28 protocol should be used for communication between Hosts
29 and server, and server and clients. If a defined technology
30 such as SNMP is decided upon then this can easily be sub-
31 stituted in due to the modular design of the applications.
32
33 - The protocol should be based on XML or a system not too
34 dissimilar. The reason for this is it all text based and
35 thus easier to process.
36
37 - The use of UDP and TCP/IP as communication layers between
38 hosts and filer/collectors. To be discussed further with
39 possible input from JC and PSSC.
40
41 The use of heart beats was also discussed. It was decided
42 that further thought would have to be given to the implication
43 of these before they would be finalised.
44
45 Meeting concluded @ 12:00pm
46
47 Meeting re-conviened @ 3:00pm
48
49 Discussion on the implemention of the plugin technology
50 concluded that data should flow through plugins in a
51 sequental manner and should remain as plain text at all times.
52 It was also discussed that plugins should have a 'order' coded
53 into them, to allow the data to flow in a suitable manner for
54 the plugins.
55
56 Meeting concluded @ 4:30pm