1 |
tdb |
1.1 |
Minutes of meeting 19/03/2001 @ 2pm |
2 |
|
|
Location: UKC Computer Science Meeting Room |
3 |
|
|
|
4 |
|
|
Present: ab11, ajm4, pjm2, tdb1 |
5 |
|
|
|
6 |
|
|
The first part of the meeting was a usual "catch up" |
7 |
|
|
session. Each of the group members reported back on what |
8 |
|
|
they'd been doing, and where things stood. |
9 |
|
|
|
10 |
|
|
AJ was proud to announce that Conient was now complete, or |
11 |
|
|
at least as complete as it was going to be for the project. |
12 |
|
|
There were of course many more features that could have been |
13 |
|
|
added, but time was restrictive. This has been the case with |
14 |
|
|
most things. The GUI had been reworking to provide a sorted |
15 |
|
|
list of hosts, which was much easier to navigate. A few bugs |
16 |
|
|
had been ironed out with the layout, and a general tidy up |
17 |
|
|
had been done. |
18 |
|
|
|
19 |
|
|
Paul said the web reports were well in progress, maybe even |
20 |
|
|
finished. The pages for the "latest data" and "alerts" had |
21 |
|
|
been done, and linked together with the historical side of |
22 |
|
|
things. A summary alerts page had also been generated. |
23 |
|
|
The other group members were impressed by the webpages |
24 |
|
|
generally, but felt that a few more smaller things were |
25 |
|
|
required. Firstly a "one screen" summary of selected hosts, |
26 |
|
|
maybe for display on a "public monitor" near reception |
27 |
|
|
desks. Concern was also raised that the whole lot should be |
28 |
|
|
even more tightly integrated... so it appeared as one |
29 |
|
|
system, rather than a collection of three subpages. |
30 |
|
|
|
31 |
|
|
Paul also added at this stage that winhost had been |
32 |
|
|
finished. It now reported uptime correctly, and the icon had |
33 |
|
|
been made blue (instead of pink). The few minor bugs that |
34 |
|
|
existed had been ironed out, and an installer had been made. |
35 |
|
|
AJ reported that it now worked on his system, and didn't |
36 |
|
|
give an OCX error as before. |
37 |
|
|
|
38 |
|
|
Tim was pleased to inform the group that the server seemed |
39 |
|
|
to be fixed. He and AJ had spent a long night in the |
40 |
|
|
computer room debugging and fixing parts of the server. In |
41 |
|
|
the end it seems it was a deadlock (or livelock?) issue in |
42 |
|
|
the Queue. The system had been running for nearly 48 hours |
43 |
|
|
without any hassle and was looking good. |
44 |
|
|
Tim also added that the server was essentially complete, |
45 |
|
|
except for the LocalClient which still needed a few minor |
46 |
|
|
points ironing out with alerting. |
47 |
|
|
|
48 |
|
|
It was also noted that statgrab and ihost were as good as |
49 |
|
|
finished, although a few minor issues still needed solving. |
50 |
|
|
These would be solved ASAP. |
51 |
|
|
|
52 |
|
|
Ash informed the group that he had finally solved the 1024kb |
53 |
|
|
UDP packet size problem on the C++ host. It required |
54 |
|
|
changing the socket library, which was not satisifactory, |
55 |
|
|
but it at least worked. He also added that documentation on |
56 |
|
|
both the C++ host and the Java host had begun. |
57 |
|
|
|
58 |
|
|
The group noted the urgency to complete documentation. With |
59 |
|
|
little over a week to go, and a lot to write, things were |
60 |
|
|
getting very close. As coding had virtually completed now, |
61 |
|
|
documentation could be done throughout the week. As luck |
62 |
|
|
would have it, everyone had a databases assignment due in |
63 |
|
|
midweek, which may take up valuable time. |
64 |
|
|
|
65 |
|
|
There will be a meeting with Ian at 12pm on Thursday, and |
66 |
|
|
the usual meeting on Monday at 2.15pm. |