ViewVC Help
View File | Revision Log | Show Annotations | Revision Graph | Root Listing
root/i-scream/projects/cms/documentation/plan/doc_strategy.txt
Revision: 1.25
Committed: Thu Mar 29 04:27:48 2001 UTC (23 years, 8 months ago) by tdb
Content type: text/plain
Branch: MAIN
Changes since 1.24: +1 -1 lines
Log Message:
Another one bites the dust :-)

File Contents

# User Rev Content
1 ajm 1.1 i-scream Documentation Strategy
2     ===============================
3    
4     This document details the main document headings that need
5     to be produced. As new documents are started and developed,
6     please add your login and an estimate of completeness to
7     the heading you are tackling.
8    
9    
10    
11     User docs
12     ---------
13 tdb 1.24 Server & Configuration 40% ajm4
14     Client 100% ajm4
15 ajm 1.1 Hosts
16 tdb 1.24 Java 100% ab11
17     iHost 100% pjm2
18     C++ 100% ab11
19     winHost 100% pjm2
20 ajm 1.1 Web interface
21 tdb 1.24 historical 100% pjm2
22     real time 100% pjm2
23 ajm 1.1
24    
25     Maintainence/technical docs
26     ---------------------------
27 tdb 1.24 Server 100% tdb1
28     Core 100% tdb1
29     Filter 100% tdb1
30     FilterManager 100% tdb1
31     RootFilter 100% tdb1
32     ComponentManager 100% tdb1
33     Util 100% tdb1
34     DBInterface 100% tdb1
35 tdb 1.19 ClientInterface
36 tdb 1.24 localclients 100% tdb1
37     tcp clients 100% tdb1
38 tdb 1.19 Plugins
39 tdb 1.24 filters 100% tdb1
40     service checks 100% tdb1
41     alerters 100% tdb1
42     monitors 100% tdb1
43     Database 100% pjm2
44 tdb 1.25 CorbaServices 100% tdb1
45 tdb 1.24 Client (Conient) 100% ajm4
46 ajm 1.1 Hosts
47 tdb 1.24 Java 100% ab11
48     iHost 100% pjm2
49     C++ 100% ab11
50     winHost 100% pjm2
51 ajm 1.1 Web interface
52 tdb 1.24 historical 100% pjm2
53     real time 100% pjm2
54 ajm 1.1
55     Implementation
56     --------------
57 tdb 1.24 ALL CODE! 100% ALL
58 ajm 1.1
59     Designs
60     -------
61 tdb 1.24 estimated time allocation 100% pjm2
62     implementation phases 100% pjm2
63 ajm 1.1
64     Analysis
65     --------
66     pre
67     talking to jc - initial spec
68     looking at other projects (eg BB)
69    
70     post
71     what have we done
72     what haven't we done
73     what could we have done
74 tdb 1.24 other projects comparison (eg BB)
75 ajm 1.1
76     Specifications
77     --------------
78 tdb 1.24 spec from jc 100% pjm2
79 tdb 1.19 protocols
80 tdb 1.24 host/server 100% pjm2/ajm4
81     client/server 100% ajm4
82     XML over UDP standards 100% pjm2
83 ajm 1.1
84 tdb 1.24 coding standards 100% tdb1
85     documentation standards 100% pjm2
86 ajm 1.1
87     Process Documentation
88     ---------------------
89     process doc
90 tdb 1.24 cvs use 100% tdb1
91     cvs logs 100% tdb1
92     software builds 100% tdb1
93     meetings 100% ab11
94     task management 100% ab11
95     use of website 100% pjm2
96     meeting minutes 100% ajm4
97     CVS logs 100% ALL