1 |
pjm2 |
1.1 |
Estimated time allocation |
2 |
|
|
========================= |
3 |
|
|
|
4 |
|
|
pjm2, 23/10/2000 |
5 |
|
|
|
6 |
|
|
|
7 |
|
|
Combined efforts in hours: - |
8 |
|
|
|
9 |
|
|
|
10 |
|
|
Management and Admin tasks (200 total) |
11 |
|
|
webpages (10) |
12 |
|
|
cvs (10) |
13 |
|
|
meetings/minutes/meetings with iau (180) |
14 |
|
|
|
15 |
|
|
Requirements, analysis, specification (85 total) |
16 |
|
|
Find out what the reqs are (5) |
17 |
|
|
look at other systems (30) |
18 |
|
|
Analysing our own ideas (40) |
19 |
|
|
produce spec (10) |
20 |
|
|
|
21 |
|
|
Design (200 total) |
22 |
|
|
UML (25) |
23 |
|
|
Interface design (20) |
24 |
|
|
Protocol design (30) |
25 |
|
|
Server design (40) |
26 |
|
|
GUI/Client design (20) |
27 |
|
|
Host design (10) |
28 |
|
|
Web interface design (35) |
29 |
|
|
DB infrastructure (20) |
30 |
|
|
|
31 |
|
|
Implempentation (300 total) |
32 |
|
|
Phase 1 (15) |
33 |
|
|
Phase 2 (45) |
34 |
|
|
Phase 3 (45) |
35 |
|
|
Phase 4 (30) |
36 |
|
|
Phase 5 (115) |
37 |
|
|
Further developments of public release (50) |
38 |
|
|
|
39 |
|
|
QA, QC, Testing (195 total) |
40 |
|
|
Doc specs (5) |
41 |
|
|
Coding specs (10) |
42 |
|
|
Testing each of the modules (180) |
43 |
|
|
|
44 |
|
|
Documentation (150 total) |
45 |
|
|
User docs (40) |
46 |
|
|
Maintenance docs (60) |
47 |
|
|
Internal docs (50) |