1 tdb 1.1 Minutes of meeting 19/03/2001 @ 2pm
2     Location: UKC Computer Science Meeting Room
3    
4     Present: ab11, ajm4, pjm2, tdb1
5    
6     The first part of the meeting was a usual "catch up"
7     session. Each of the group members reported back on what
8     they'd been doing, and where things stood.
9    
10     AJ was proud to announce that Conient was now complete, or
11     at least as complete as it was going to be for the project.
12     There were of course many more features that could have been
13     added, but time was restrictive. This has been the case with
14     most things. The GUI had been reworking to provide a sorted
15     list of hosts, which was much easier to navigate. A few bugs
16     had been ironed out with the layout, and a general tidy up
17     had been done.
18    
19     Paul said the web reports were well in progress, maybe even
20     finished. The pages for the "latest data" and "alerts" had
21     been done, and linked together with the historical side of
22     things. A summary alerts page had also been generated.
23     The other group members were impressed by the webpages
24     generally, but felt that a few more smaller things were
25     required. Firstly a "one screen" summary of selected hosts,
26     maybe for display on a "public monitor" near reception
27     desks. Concern was also raised that the whole lot should be
28     even more tightly integrated... so it appeared as one
29     system, rather than a collection of three subpages.
30    
31     Paul also added at this stage that winhost had been
32     finished. It now reported uptime correctly, and the icon had
33     been made blue (instead of pink). The few minor bugs that
34     existed had been ironed out, and an installer had been made.
35     AJ reported that it now worked on his system, and didn't
36     give an OCX error as before.
37    
38     Tim was pleased to inform the group that the server seemed
39     to be fixed. He and AJ had spent a long night in the
40     computer room debugging and fixing parts of the server. In
41     the end it seems it was a deadlock (or livelock?) issue in
42     the Queue. The system had been running for nearly 48 hours
43     without any hassle and was looking good.
44     Tim also added that the server was essentially complete,
45     except for the LocalClient which still needed a few minor
46     points ironing out with alerting.
47    
48     It was also noted that statgrab and ihost were as good as
49     finished, although a few minor issues still needed solving.
50     These would be solved ASAP.
51    
52     Ash informed the group that he had finally solved the 1024kb
53     UDP packet size problem on the C++ host. It required
54     changing the socket library, which was not satisifactory,
55     but it at least worked. He also added that documentation on
56     both the C++ host and the Java host had begun.
57    
58     The group noted the urgency to complete documentation. With
59     little over a week to go, and a lot to write, things were
60     getting very close. As coding had virtually completed now,
61     documentation could be done throughout the week. As luck
62     would have it, everyone had a databases assignment due in
63     midweek, which may take up valuable time.
64    
65     There will be a meeting with Ian at 12pm on Thursday, and
66     the usual meeting on Monday at 2.15pm.